Course syllabus PTRSS - Projecting of Wood Processing Mills (FFWT - SS 2019/2020)


     Czech          English          


Course code:
PTRSS
Course title in Czech: Projecting of Wood Processing Mills
Course title in English:
Projecting of Wood Processing Mills
Semester:
SS 2019/2020
Mode of completion and number of credits:
Exam (5 credits)
Mode of delivery and timetabled classes:
full-time, 2/2/2 (hours weekly/ hours weekly/ days in semester) (hours of lectures per week / hours of seminars per week)
part-time, 18/0/0 (h/h/days in semester) (lectures per period / seminars per period)
Level of course: master continuing
Course type:
optional
Type of delivery:
consulting
Mode of delivery for our mobility students abroad:
-- item not defined --
Language of instruction:
Czech
Course supervisor:
Course supervising department:
Faculty:
Faculty of Forestry and Wood Technology
Teachers:
doc. Ing. Karel Janák, CSc. (examiner, instructor, lecturer, supervisor)
Prerequisites:
 
Timetable in this semester:
-- item not defined --
 
Aim of the course and learning outcomes:
To get know to do the production analysis, to determine needed operations, necessary for the production of given volume and assortment of sawn timber, to design the general concetpion, corresponding machines and level of mechanization, to consider the correlations and influences of the operations. To get know to engineer and expertise the projects of sawmills and sawn timber yards and their parts, its technological equipment, layout and respect the flow of work of subsequent technological parts.
 
Course content:
1.
Conception of the sawmills - basic types, properties, advantages and disadvantages depending on the volume and assortment of production. (allowance 2/0)
2.
Production. Volume of production, assortment of processed logs and produced sawn timber. Production analysis, choice of the sawmill conception. Mechanization type and level, connection with volume and asssortment of produced sawn timber and with the sawmil equipment. (allowance 6/4)
3.
Layout of the sawmills.
Technology in front of sawmills, operations, connections with the log yard.
Operations in the sawmill, ways of their carrying out in the connection with the volume and assortment of production. Machines and mechanization, their properties and suitability of application. Solution of sawmill layout according to volume and assortment of the production, to the preceded and following technological parts and to the layout of the mill.
(allowance 12/14)
4.
Sorting and final preparing of the sawn timber.
Operations, ways of their carrying out (mesuring, grading, sorting, trimming, marking, piling, wrapping, record keeping) according to the volume and assortment of production. Equipment and layout of sorters and lines for final preparing and make-up of the sawn timber.
(allowance 4/2)
5.Sawn timber yards.
Volumes of stored sawn timber, ways of storage. Proportion of dry/wet sawn timber, ways of drying, choice of the suitable way of drying and type of drying kilns. Organization and layout of sawn timber yards. Types of mechanization, their properties, suitability, influence on the organization of storage.
(allowance 2/4)
6.
General layout of the mill.
Parts of the mill, production and non-production parts (power station, maintenance, administration). Wastes, their usability, treatment. Transport, its types, routes, volumes, distances, continuity.
(allowance 2/4)
Learning activities and teaching methods:
Type of teaching method
Daily attendanceCombined form
lecture
28 h
0 h
practice
28 h
0 h
seminar
0 h16 h
professional educational excursion
16 h
8 h
consultation
6 h
14 h
preparation for exam22 h42 h
elaboration and execution of projects
40 h
60 h
Total140 h140 h
 
Assessment methods:
Credit - elaborating and defence of the above mentioned project is required. The extend of the project is about 20 pages of technical report and 10 - 15 pages A4 of drawings.
Exam - oral with written preparation (notices, drawing of layout of technolofical part, machine etc.). 3 questions from the areas: technology of production, machinery, sorting and storage of sawn timber. The preparation takes approx. 25 minutes, the exam takes the same time.
 
Assessment criteria ratio:
Requirement type
Daily attendance
Combined form
Total
0 %
0 %
 
Recomended reading and other learning resources:
Basic:
KLEMENT, I. -- DETVAJ, J. Technológia prvostupňového spracovania dreva: [vysokoškolská učebnica]. 1st ed. Zvolen: Technická univerzita vo Zvolene, 2007. 325 p. ISBN 978-80-228-1811-7.
Spaner, Kreissägen, Bandsägen: Arbeiten und Anlagen im Sägewerk. Band 2. Stuttgart: DRW-Verlag Stuttgart, 1989. 300 p. ISBN 3-87181-332-X.
Gatter Nebenmaschinen Schnitt- und Restholz- behandlung. Stuttgart: DRW-Verlag Stuttgart, 1991. 327 p. ISBN 3-87181-333-8.
BRUNECKÝ, P. -- GRYC, V. -- HAVÍŘOVÁ, Z. -- HOLAN, J. -- HOLOUŠ, Z. -- HORÁČEK, P. -- HRÁZSKÝ, J. -- JANÁK, K. -- KRÁL, P. -- MUZIKÁŘ, Z. -- ONDRÁČEK, K. -- ROUSEK, M. -- ŠOPÍK, M. -- VAVRČÍK, H. Zpracování dřeva: materiály -- výrobky -- konstrukce -- technologie. 1st ed. Plzeň: Verlag Dashöfer, 2009. 650 p. ISSN 1803-8905.

Recommended:
JANÁK, K. Sklady dřevní suroviny. 1st ed. Brno: Mendelova zemědělská a lesnická univerzita v Brně, 2008. 133 p. ISBN 978-80-7375-214-9.
Der Rundholzplatz. Stuttgart: DRW-Verlag Stuttgart, 1989. 43 p. ISBN 3-87181-331-1.
KAFKA, E. Dřevařská příručka. SNTL, 1989.

Course listed in study plans for this semester:
-- item not defined --
 
Course listed in previous semesters:
Teaching place:
Brno


Last modification made by Ing. Alice Malá on 02/27/2020.

Type of output: